On 6 July, a multimodal trip was organised to deliver building materials to the heart of Ghent using the Green Wave, a small electric boat dedicated to urban logistics.
Ghent Test-bed
![](/media/18479/gand-2.png)
![](/media/18480/gand-5.png)
![](/media/18481/gand-3.png)
![](/media/18482/gand-7.png)
![](/media/18483/gand-6.png)
![](/media/18484/gand-4.png)
On 6 July, a multimodal trip was organised to deliver building materials to the heart of Ghent using the Green Wave, a small electric boat dedicated to urban logistics.