In partnership with the initiatives Via Palletto and Navigation à Patit Gabarit, we organised an extension of the existing multi-stop, multi-client and multi-product shuttle (between Flanders and Wallonia) to the Gobert Matériaux site in Peruwelz. This experiment took place from 25 to 30 November. Read More
On 8 & 9 August, a multimodal trip was organised to deliver wooden building materials into the heart of Paris, to the construction site of "Wood Up Tower".
The wood was supplied by the manufacturer Poulingue and transported using the Zulu vessel and FlexiMalle container. Read More
On 6 July, a multimodal trip was organised to deliver building materials to the heart of Ghent using the Green Wave, a small electric boat dedicated to urban logistics. Read More
On 8 June, the Maasdam, a Shipit vessel, arrived at the BCCC North (Brussels Construction Consolidation Center) in the Port of Brussels to be unloaded.
Part of the cargo was transferred into a smaller vessel and delivered to the BCCC South, Bistebroeck Quay in Anderlecht. Read More